First Egg Intake
Life-support control wiring, fresh water pipework and chiller systems completed to a fixed weekly deadline ahead of each scheduled egg delivery.
Case study / BSL-CS-02
Principal site management and multi-trade delivery on a freshwater broodstock hatchery in the North West Highlands for a major Scottish salmon producer, with fish life-support control wiring delivered in-house as part of the same scope, under direct reporting to the project’s engineering lead.
A flagship-scale freshwater broodstock hatchery in the North West Highlands, delivered for a major Scottish salmon producer. Brian Stevenson Ltd held the Site Manager role on-site throughout, reporting directly to the client’s project engineering lead, and carried overall responsibility for programme, safety and multi-trade coordination across carpentry, general labour, civils and specialist subcontractors — while delivering the core technical scope in-house: installation and control wiring of the fish life-support systems (intake pumps, chillers, dosing pumps, oxygenation).
Life-support control wiring, fresh water pipework and chiller systems completed to a fixed weekly deadline ahead of each scheduled egg delivery.
Control cabling and pre-wire across 17 systems, including intake, egg incubation, dosing pump and chiller connections.
Servicing and fault resolution across a three-generator standby fleet, coordinated directly with manufacturer commissioning engineers.
A four-day high-voltage outage window held to schedule, with standby generation covering welfare and process loads throughout.
Full paging, auto-dialer and annunciator panel installation across both plant rooms.
Quarantine zones enforced and all construction plant cleared to a same-day deadline, allowing farming operations to begin on schedule.
Life-support and effluent systems brought to readiness ahead of live fish arriving by wellboat.
Brian Stevenson Ltd operated an open-book reporting policy throughout the engagement: daily site logs and executive summaries addressed directly to the client’s engineering lead, maintaining a single, consistent line of communication rather than filtered or delayed updates. This discipline extended to every contractor sharing the site — civils, bulk gas supply, process commissioning, manufacturer engineers and painting contractors alike — with issues surfaced and escalated the same day they arose, not held back for a scheduled review. On a project of this scale, that single-point, multi-trade oversight — rather than siloed subcontracting — was what kept two hard deadlines either side of a full HV outage on schedule, and gave the client a verifiable, real-time record of decisions and progress throughout.
A programme-managed electrical and controls upgrade delivered on a remote freshwater hatchery in the North West Highlands, sequenced around live production deadlines.